BOTSWANA (Eagle Power Transmission):
  • 2003: Thamaga-Kanye132kV Transmission Line
  • 1999: Thamaga-Jwaneng132kV Transmission Line
  • 1994 To 1995: Serule switching station 132kV and 220kV Line deviation
MOÇAMBIQUE:
  • 1999 To 2000: Maputo-Mozal substation 132 kV Transmission Line/ Quelimane 33 kV Line
  • 2014: Cahora Bassa 533kV Transmission Line Restoration
NAMIBIA:
  • 2001 To 2002: Van Eck Walvis bay
  • 2001: Kokerbom Orib-Vulcan 400kV Transmission Line
  • 1993: Omburu Ruakana 330 kV Transmission Line refurbishment
SOUTH AFRICA:
  • 2019: Medupi Loop In & Out 400kV Lines
  • 2019: Apollo-Cahora Basa Emergency Tower Recovery
  • 2019 - 2020: Alpha Beta 1&2 & Hydra-Perseus 1 765 Transmission Lines
  • 2019 - 2022: Matsoku To Polihali 132kV Transmission Line
  • 2019 - 2021: Medupi Borutho 400kV Transmission Line
  • 2019 - 2021: Hydra Perseus 1 765kV Line (Emergency Work)
  • 2017 - 2019: Ankerlig Sterrekus 400kV Double circuit transmission line
  • 2017 - 2018: Masa Ngwedi 1&2 400kV & 765kV Transmission Line Section E
  • 2016 - 2018: Everest Merapi 400kV Transmission Line
  • 2014 - 2016: Kappa Sterrekus 765kV Transmission Line Section A
  • 2014 - 2015: Duvha Kusile 400kV Transmission Line and Duvha Kendal Line Lift
  • 2014 - 2015: Ferrum –Mookodi 400kV Transmission Line Section A and B
  • 2011 - 2013: Ferrum –Mookodi 400kV Transmission Line Section A and B
  • 2011 - 2012: Ferrum –Mookodi 400kV Transmission Line Section A and B
  • 2011 - 2012: Ferrum deviation 275kV
  • 2011 - 2012: Gamma-Kappa 765kV Transmission Line Section A
  • 2009 - 2010: Hydra Perseus 765kV Transmission Line Section B
  • 2008: Hydra Gamma 765kV Transmission Line Line 1 & 2
  • 2007: Mercury-Perseus 765kV Transmission Line / Beta-Delphi 400 kV Transmission Line Section 2
  • 2005: Hendrina Vulcan #2, 400kV line deviations/ Atlas Snowdon 275kV Line 1&2 to Atlas-Scafel & Everest line/ Apollo 400kV substation (bay changes)/ Alpha-Beta 765kv guy anchor refurbishment line/ Vantech 275kV double circuit loop-ins into xstrata/ Matimba-Witkop 400kv Transmission Line
  • 2004: Bighorn-Marang 400kV Transmission Line Section / Merensky –Witkop 400kV turn-in Lesedi substation
  • 2003: Athene-Pegasus 400kV Trnamission Line
  • 2002: Arnot-Vulcan 400kV Transmission Line/ 275kV Sasolburg deviation OHTL
  • 2000 - 2001: Tower erection at Eskom testing station